Park Avenue Elementary School & Freehold Intermediate School
FREEHOLD BOROUGH SCHOOL DISTRICT
Freehold, New JerseyThis project consists of additions, alterations, renovations and site
enhancements to an existing joint elementary and intermediate school complex.
Addition spaces include a library media center with associated
support offices & computer instruction area; intermediate school gymnasium
with girls locker room;cafeteria expansion; kitchen support spaces for storage
and receiving areas;new general classrooms; technology department expansion;boys
and girls toilet rooms; new main entrance secure vestibule with an entrance &
drop-off canopy and a new main office reception and waiting area.
Site enhancements include a new drop-off loop drive at the gym
& library addition with associated new sidewalks and new parking areas.
Renovations include conversion of pre-kindergarten rooms into
general classrooms & resource rooms; conversion of small group rooms into
classrooms; conversion of the existing cafetorium stage into serving &
kitchen; conversion of the existing serving & kitchen into resource and
storage rooms; conversion of the existing storage/receiving area into a new
intermediate boys locker room; conversion of a general classroom into a nurse’s
suite; and conversion of the existing library into a child study team suite
& resource room.
Capital upgrades include building-wide replacement of various HVAC
systems to include air conditioning, building-wide technology infrastructure
upgrades; replacement of domestic water heaters, main electrical switchgear,
interior lighting and emergency power systems; replacement of building-wide
fire alarm and public address systems; partial roofing replacement; and student
locker replacement. Also included are electric, water, & natural gas
utility upgrades.
Click HERE to read an article by the Asbury Park Press on the construction for the Park Avenue School Complex.