The Base Bid work consists of but is not limited to the following:
Absegami High School: Remove existing exterior doors and hardware as indicated on the drawings. Provide and install new FRP doors, hardware and insulated laminated glass. Provide and install security window film. Scrape, prime and paint existing steel lintel.
Cedar Creek High School: Remove and replace existing door hardware, as indicated on the drawing / door & frame schedule and specifications. Provide and install security window film, as indicated on the drawing / door & frame schedule. Scrape, prime and paint existing steel lintel, as indicated on the drawing / door & frame schedule. Alternate Bids: Alternate Bid No. A-1 @ Absegami HS: Remove Existing Hollow Metal Door Frames and Install New Aluminum Door Frames & Sealant.
Alternate Bid No. A-2 @ Absegami HS: Remove Existing Hollow Metal Door Frames and Install New Aluminum Door Frames & Sealant.
Alternate Bid No. C-1 @ Cedar Creek HS: Remove Existing Doors & Hardware and Install New FRP Doors, Glazing and Hardware.
|