Project Name: | Partial Roofing Replacement at Freehold Twp. HS and Marlboro HS |
Project Owner: | Freehold Regional High School District |
FVHD Project Number: | 5227C1 / 5227F1 |
Project Location: | FTHS: 281 Elton Adelphia Rd, Freehold NJ 07728 MHS: 95 N. Main St, Marlboro, NJ 07746 |
Pre-Bid Meeting Date: | Wednesday, February 16, 2022 |
Pre-Bid Meeting Time/Location: | 3:30 PM, starting at the Administration Building, 11 Pine Street, Englishtown, NJ 07726. Attendance at the prebid meeting is recommended. |
Bid Due Date: | Thursday, March 3, 2022 |
Bid Due Time/Location: | 3:30 PM / Freehold Regional Board of Education, Attn: Sean Boyce, 11 Pine Street, Englishtown, NJ 07726 |
Addenda Issued: | Addendum No. 1 issued February 21, 2022Clarification No. 1 issued March 2, 2022
CLICK THE LINK BELOW TO ACCESS ADDENDA / CLARIFICATIONS FOR DOWNLOAD: (DISCLAIMER: All qualified bidders/contractors intent on submitting a bid proposal for this project are required to register their company with, and obtain original bid documents from, Fraytak Veisz Hopkins Duthie, PC (FVHD) Architects-Planners, 1515 Lower Ferry Road, Trenton, New Jersey 08618, (609) 883-7101. The bid documents are the intellectual property of FVHD and are copyright protected. Obtaining bid documents from any other source may result in incorrect or incomplete information. Failure to comply with this bidding requirement may result in the submission of a bid proposal based on incorrect or incomplete bid documents for which the bidder is solely responsible.)
|
Contract(s): | Separate Bids will be received for the following: Contract No. 1 – Partial Roofing Replacement at Freehold Township HS Contract No. 2 – Partial Roofing Replacement at Marlboro HS Contract No. 3 – Combined Single Overall Contract comprising Contract No. 1 & Contract No. 2
DPMC Classifications: C009 Prime with C032, C047, C066 and C068 Subcontractors OR C066/C068 Prime with C032, C047 Subcontractors |
Project Description: | Complete removal of
existing roofing system down to existing roof deck. The new roofing system
shall be a modified bitumen roofing system, with a 20-year NDL warranty. All
metal edge and coping will be included in roof manufacturer’s warranty. All
existing drains shall receive a new retro drain insert. |
Estimated Project Cost: | Contract No. 1 – Freehold Twp HS: $2.3 Million
Contract No. 2 – Marlboro HS: $1.4 Million |
Contract Document Cost: | Free electronic download is available for this project if you email us a completed registration form. Forms can be found at the top of this page: https://fvhdpc.com/bids/bidlisting Read the top paragraph for more info on how to obtain a bid set and to download the bidders registration form needed. Bid Sets can also be purchased on DVD ($25) or as a hard copy set ($250). |
FVHD Contact: | Mike Seneca |
Additional Information: | All requests for information (RFI) must be submitted to the Architect by February 21, 2022, via facsimile at (609) 883-2694 or via common carrier to Fraytak Veisz Hopkins, P.C., 1515 Lower Ferry Road, Trenton, NJ 08618 with the Project Title and Project Number referenced. |