Project Name: | Interior and Exterior Door and Window Replacement at Clearview Regional Middle School & High School |
Project Owner: | Clearview Regional High School District |
FVHD Project Number: | 5162A4-5162B4 |
Project Location: | 595 Jefferson Rd (MS) and 625 Breakneck Rd (HS), both in Mullica Hill, NJ 08062 |
Pre-Bid Meeting Date: | Thursday, August 31, 2023 |
Pre-Bid Meeting Time/Location: | 2:30 PM, starting at Clearview Regional High School, 595 Jefferson Road, Mullica Hill, NJ 08062 (check in at main office). Attendance at the prebid meeting optional but encouraged. |
Bid Due Date: | Thursday, September 21, 2023 |
Bid Due Time/Location: | 3:00 PM / Clearview Regional Board of Education, Attn: Esther Pennell, 420 Cedar Road, Mullica Hill, NJ 08062 |
Addenda Issued: | Addendum No. 1 issued September 12, 2023
CLICK THE LINK BELOW TO ACCESS ADDENDA / CLARIFICATIONS FOR DOWNLOAD: (DISCLAIMER: All qualified bidders/contractors intent on submitting a bid proposal for this project are required to register their company with, and obtain original bid documents from, Fraytak Veisz Hopkins Duthie, PC (FVHD) Architects-Planners, 1515 Lower Ferry Road, Trenton, New Jersey 08618, (609) 883-7101. The bid documents are the intellectual property of FVHD and are copyright protected. Obtaining bid documents from any other source may result in incorrect or incomplete information. Failure to comply with this bidding requirement may result in the submission of a bid proposal based on incorrect or incomplete bid documents for which the bidder is solely responsible.)
|
Contract(s): | Single Overall Contract (C008 or C009 Prime with C092 Sub ~OR~ C011 Prime with C012 and C092 Subs) |
Project Description: | 1. Clearview Regional Middle School, FVHD-5162A4: (As indicated on the drawings): Remove and replace interior doors and hardware and all associated work. Patch, prime and paint existing hollow metal door frames to remain. Remove and replace existing aluminum storefront system, door hardware and threshold, and all associated work. Patch, prime and paint any existing adjacent surfaces damaged as a result of the work. Remove and replace exterior doors with new FRP door and hardware and associated work. Remove and replace aluminum framed windows and all associated work. Provide and install security window film on exterior aluminum sidelights. Provide and install fire rated impact glazing with the manufacturer’s applied film in existing / new wood doors and hollow metal frames and all associated work. All other indicated work.
2. Clearview Regional High School, FVHD-5162B4: (As indicated on the drawings): Remove and replace interior doors and hardware and all associated work. Patch, prime and paint existing hollow metal door frames. Remove and replace existing aluminum storefront system, hardware, threshold, and all associated work. Patch, prime and paint any existing adjacent surfaces damaged as a result of the work. Remove and replace exterior doors with new FRP door and hardware and all associated work. Provide and install prefinished aluminum insulated panels and all associated work within new storefront system. Provide and install fire rated impact glazing with the manufacturer’s applied film in new wood doors. Provide and install security window film on exterior aluminum sidelights. |
Estimated Project Cost: | $1.6 Million |
Contract Document Cost: | Free electronic download of bidding package is available for this project if you email a completed registration form to info@fvhdpc.com
Registration forms can be downloaded from the top of this page: https://fvhdpc.com/bids/bidlisting
Bid Sets can also be purchased on DVD ($25) or as a hard copy set ($200).
You can indicate on the registration form which way you’d like to receive the bid set. |
FVHD Contact: | Dan Schittone: All requests for information (RFI) must be submitted in writing by September 7, 2023 and sent by faxing to 609-883-2694 or by emailing cwoodward@fvhdpc.com, or via common carrier to the Architect. All correspondence must include the Architect Project Name and Project Number referenced. The Architect is not responsible for misdirected or misrouted correspondence. |