Project Name: | Renovations to West Windsor-Plainsboro High School North REBID |
Project Owner: | West Windsor-Plainsboro Regional School District |
FVHD Project Number: | 5063K2 |
Project Location: | 90 Grovers Mill Road, Plainsboro, NJ 08536 |
Pre-Bid Meeting Date: | Wednesday, June 22, 2022 |
Pre-Bid Meeting Time/Location: | 3:30 PM, at West Windsor-Plainsboro High School North, 90 Grovers Mill Road, Plainsboro, NJ 08536. Attendance is strongly encouraged. |
Bid Due Date: | Thursday, July 14, 2022 |
Bid Due Time/Location: | 2:00 PM, to the West Windsor-Plainsboro Regional School District Board of Education; Administrative Offices, 321 Village Road East, West Windsor, NJ 08550. |
Addenda Issued: | Addendum No. 1 issued July 5, 2022 Addendum No. 2 issued August 29, 2022 Addendum No. 3 issued September 20, 2022
CLICK THE LINK BELOW TO ACCESS ADDENDA / CLARIFICATIONS FOR DOWNLOAD: (DISCLAIMER: All qualified bidders/contractors intent on submitting a bid proposal for this project are required to register their company with, and obtain original bid documents from, Fraytak Veisz Hopkins Duthie, PC (FVHD) Architects-Planners, 1515 Lower Ferry Road, Trenton, New Jersey 08618, (609) 883-7101. The bid documents are the intellectual property of FVHD and are copyright protected. Obtaining bid documents from any other source may result in incorrect or incomplete information. Failure to comply with this bidding requirement may result in the submission of a bid proposal based on incorrect or incomplete bid documents for which the bidder is solely responsible.)
|
Contract(s): | Single Overall Contract (C008 or C009 with C029, C030, C032, C047) |
Project Description: | New addition educational projects as follows: 1. Construct new dance studio classroom with instructional space, male/female changing rooms, storage room and office. New addition will be located adjacent to the existing performing arts spaces. 2. Renovations/Reconfigurations in the following areas: Existing Multi-Purpose Life Skills 105 to be reconfigured as Culinary Sciences Lab; existing Media Center to be renovated as Learning Commons including new finishes, collaboration areas, quick stop area and lounge/gathering spaces. |
Estimated Project Cost: | $2 Million |
Contract Document Cost: | Free electronic download is available for this project. Bid Sets can also be purchased on DVD ($25) or as a hard copy set ($250). Visit https://fvhdpc.com/bids/bidlisting and read the top paragraph for more info on how to obtain a bid set and to download the bidders registration form needed. All fees are non-refundable.
Shipping (hard copy or CD): Please provide your shipper number (FedEx or UPS) and preferred shipping speed. For hard copy sets only: In addition to your shipper number, an additional fee of $25 for handling must also be provided. Payment must be in the form of a check or money order, made payable to FVHD Architects/Planners. |
FVHD Contact: | Indrani Bapat / Steve Schreyer - All requests for information (RFI) must be submitted in writing by end of business June 29, 2022, and sent by faxing to 609-883-2694 or by emailing cwoodward@fvhdpc.com, or via common carrier to the Architect. All correspondence must include the Architect Project Name and Project Number referenced. The Architect is not responsible for misdirected or misrouted correspondence. |
Additional Information: | Project Start: 8/22/2022 Substantial Completion: 3/31/2023 Final Completion: 5/01/2023 |