Pennsbury High School

Fraytak Veisz Hopkins Duthie, P.C.









PENNSBURY SCHOOL DISTRICT
Fairless Hills, Pennsylvania 

Size: 58,616 SF Addition
Capacity: 3,000, Grades 9-12
Construction Cost: $30,292,715
Completed: 2005

Our firm completed a feasibility study of the existing Medill Bair High School physical plant and as a result, a major expansion program was undertaken. The Pennsbury School District adopted a plan to establish a comprehensive 9-12 campus. A restructured curriculum was developed to support the campus plan. The scope of this project included a complete renovation of over 290,000 SF of existing program space with new finishes, new centralized heating and chiller plant, new mechanical and air conditioning systems, and electrical upgrades.
New construction at the Pennsbury High School West Campus included a two-story 58,616 SF addition to provide new chemistry labs, physical science labs, administrative offices, as well as a guidance and health suite. The addition provides an architectural focal point and defined entrance for what were once two separate buildings connected by a pedestrian bridge. This project represents the beginning of an ambitious educational program by the district to “blend the two campuses into one entity, creating a monitored college-like setting.”
 
 
 
© 2017 Fraytak Veisz Hopkins Duthie, P.C.   |   New Jersey   |   Pennsylvania